Fired at the muzzle, a representative 6.5 Creedmoor load (9.1 g, BTHP, 800 m/s) reaches roughly 249 mm (9.8 inches) into concrete. That is enough to defeat a typical barrier of this material — treat anything behind it as exposed.
About Concrete
Poured concrete (~100 mm) covers slabs and structural walls.